{"id":4885,"date":"2025-02-28T09:39:53","date_gmt":"2025-02-28T08:39:53","guid":{"rendered":"https:\/\/regionalnivodovod.me\/?p=4885"},"modified":"2025-04-30T07:58:02","modified_gmt":"2025-04-30T05:58:02","slug":"vodosnabdijevanje-tokom-sezone-nece-biti-ugrozeno","status":"publish","type":"post","link":"https:\/\/regionalnivodovod.me\/en\/2025\/02\/28\/vodosnabdijevanje-tokom-sezone-nece-biti-ugrozeno\/","title":{"rendered":"Vodosnabdijevanje tokom sezone ne\u0107e biti ugro\u017eeno"},"content":{"rendered":"\n<p><strong>Na izvori\u0161tu \u201cBolje Sestre\u201d, po\u010deli su radovi na izgradnji filterskog postrojenja, <\/strong><strong>\u0161to dovodi do apsolutne sigurnosti u vodosnabdijevanju crnogorskog primorja tokom naredne turisti\u010dke sezone.<\/strong><strong><\/strong><\/p>\n\n\n\n<p>Izgradnja filterskog postrojenja \u0107e obezbijeditidodatnih 100 l\/s vode za crnogorsko primorje. To &nbsp;\u0107e u zna\u010dajnoj mjeri unaprijediti vodosnabdijevanje u narednoj turisti\u010dkoj sezoni, naro\u010dito tokom avgusta, kada je potro\u0161nja vode najve\u0107a.<\/p>\n\n\n\n<p>U toku su aktivnosti na pripremi sale, \u0161to podrazumijeva radove na pripremi podloge za monta\u017eu filterskog postrojenja. Ove aktivnosti predstavljaju prvi korak ka finalizaciji ovog projekta.<\/p>\n\n\n\n<p>Priprema vode \u0107e se sastojati od vi\u0161e segmenata obrade, temeljene na nalazima prethodnih godina i mjerenjima parametara na terenu. Kvalitet proizvedene vode \u0107e odgovarati kvalitetu propisanom Pravilnikom o parametrima, provjeri usagla\u0161enosti, metodama, na\u010dinu, obimu analiza i sprovo\u0111enju monitoringa zdravstvene ispravnosti vode za ljudsku upotrebu.<\/p>\n\n\n\n<p>\u201cPo\u010detak radova na ovom projektu predstavlja veliki pomak u rje\u0161avanju dugogodi\u0161njih problema vodosnabdijevanja na crnogorskom primorju. Ula\u017eemo velike napore da svi gra\u0111ani u ovom podru\u010dju imaju uredno vodosnabdijevanje, \u0161to bez&nbsp; regionalnog vodovodnog sistema ne bi bilo mogu\u0107e. Izgradnjom filterskog postrojenja na izvori\u0161tu \u201cBolje Sestre\u201d, \u0107e se pove\u0107ati koli\u010dina vode u distributivnom sistemu u periodu kada je to najpotrebnije\u201d, istakao je, direktor Regionalnog vodovoda, <strong>Krsto Radovi\u0107.<\/strong><\/p>\n\n\n\n<p>U cilju dugoro\u010dnog rje\u0161avanja problema snabdijevanja vodom crnogorskog primorja, Regionalni vodovod \u0107e u ovoj godini&nbsp; pokrenuti aktivnosti na realizaciji projekta izgradnje jo\u0161 jednog postrojenja, dodatnog kapaciteta 500 l\/s. Kako je predvi\u0111eno godi\u0161njim planom rada Dru\u0161tva za 2025. godinu, izgradnja postrojenja \u0107e se odvijati u dvije faze kapaciteta po 250 l\/s.<\/p>\n\n\n\n<p>Ulaganjem u infrastrukturu, Regionalni vodovod ne samo da obezbje\u0111uje pouzdano vodosnabdijevanje, ve\u0107 i aktivno doprinosi razvoju turizma, ja\u010danju turisti\u010dke privrede i unapre\u0111enju kvaliteta \u017eivota gra\u0111ana Crne Gore.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE-0-1024x767.jpg\" alt=\"\" class=\"wp-image-4890\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_2-1024x767.jpg\" alt=\"\" class=\"wp-image-4892\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_4-1024x767.jpg\" alt=\"\" class=\"wp-image-4894\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"677\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_7-1024x677.jpg\" alt=\"\" class=\"wp-image-4896\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_10-1024x684.jpg\" alt=\"\" class=\"wp-image-4898\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_13-1024x683.jpg\" alt=\"\" class=\"wp-image-4900\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_20-1024x683.jpg\" alt=\"\" class=\"wp-image-4902\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_21-1024x683.jpg\" alt=\"\" class=\"wp-image-4904\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_22-1024x683.jpg\" alt=\"\" class=\"wp-image-4906\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/regionalnivodovod.me\/wp-content\/uploads\/RV-RADOVI-F-POSTROJENJE_23-1024x683.jpg\" alt=\"\" class=\"wp-image-4908\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Na izvori\u0161tu \u201cBolje Sestre\u201d, po\u010deli su radovi na izgradnji filterskog postrojenja, \u0161to dovodi do apsolutne sigurnosti u vodosnabdijevanju crnogorskog primorja tokom naredne turisti\u010dke sezone. Izgradnja filterskog postrojenja \u0107e obezbijeditidodatnih 100 l\/s vode za crnogorsko primorje. To &nbsp;\u0107e u zna\u010dajnoj mjeri unaprijediti vodosnabdijevanje u narednoj turisti\u010dkoj sezoni, naro\u010dito tokom avgusta, kada je potro\u0161nja vode najve\u0107a. U [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4888,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","footnotes":""},"categories":[9],"tags":[],"class_list":["post-4885","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-novosti"],"_links":{"self":[{"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/posts\/4885","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/comments?post=4885"}],"version-history":[{"count":2,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/posts\/4885\/revisions"}],"predecessor-version":[{"id":4911,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/posts\/4885\/revisions\/4911"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/media\/4888"}],"wp:attachment":[{"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/media?parent=4885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/categories?post=4885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/regionalnivodovod.me\/en\/wp-json\/wp\/v2\/tags?post=4885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}